Differences
This shows you the differences between two versions of the page.
| Next revision | Previous revision | ||
| 183_projects:problem2_fall2021b [2021/09/21 14:35] – created pwirving | 183_projects:problem2_fall2021b [2022/01/27 15:14] (current) – pwirving | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | ====== Project 3: Part A: Geostationary orbit ====== | + | ===== Project 3: Part A: Geostationary orbit ===== |
| + | |||
| + | |||
| + | |||
| + | {{: | ||
| + | |||
| + | |||
| + | The Carver Media Group is planning the launch of a new communications satellite. Elliot Carver (head of Carver Media Group) is concerned about the launch. This is a $200, | ||
| + | |||
| + | <WRAP info> | ||
| + | |||
| + | ==== Project 3: Learning issues ==== | ||
| + | |||
| + | * Forces cause changes in momentum | ||
| + | * Uniform circular motion | ||
| + | * Newtonian gravitational force | ||
| + | |||
| + | |||
| + | </ | ||
| + | |||
| + | |||
| + | ====== Project 3: Part B: Geostationary orbit ====== | ||
| + | |||
| + | Carver is impressed with your work, but remains unconvinced by your predictions. He has asked you to write a simulation that models the orbit of the satellite. To truly convince Carver, the simulation should include representations of the net force acting on the spacecraft, which has a mass of $15\times10^3$ kg. Your simulation should be generalized enough to model other types of orbits including elliptical ones. | ||
| + | |||
| + | https:// | ||
| + | |||
| + | /* | ||
| + | |||
| + | ====== Project 3: Part C: Delivering the Payload ====== | ||
| + | |||
| + | Back on Earth, your group has been tasked with computing the calculations for a very difficult delivery. You are being tasked with predicting how to get a box dropped from a plane to land on a specific mountain. Your group should create a model of the box moving with the plane and | ||
| + | then dropping from it so that it lands on the top of the first and highest cliff. | ||
| + | |||
| + | https:// | ||
| + | |||
| + | */ | ||
| - | The Carver Media Group is planning the launch of a new communications satellite. Elliot Carver (head of Carver Media Group) is concerned about the launch. This is a $200, | ||